A project in Cyprus aims at the newly built construction of a Liquefied Natural Gas (LNG) Receiving and Regasification Terminal for importing natural gas on the island and facilitating its use mainly for power generation purposes but also for other future industrial and urban uses. Natural gas (re-gasified LNG) will...
Safe mooring in Australia
At the North West Shelf of Australia are three jetties in open water. It's a place where LNG vessels are moored, sometimes under very challenging circumstances due to weather conditions. ⛈ Safety is key! For one of the jetties, Mampaey Offshore Industries has delivered six sets of Triple Hook Mooring...
Spare Hook Units for France
Near the city of Marseille in France, one of our customers wanted to do maintenance on its Mampaey Quick Release Mooring Hooks during its never-ending business activities. Therefore, the customer ordered three new Quick Release Mooring Hooks, including a Triple Hook Mooring Unit and a Double Hook Mooring Unit, each...
Equipment for the Excalibur
Italian energy giant Eni recently chartered LNG carrier Excalibur from the Belgian company Exmar. Currently, the LNG carrier is being converted into a floating storage unit (FSU). For this project Mampaey supplied 4 sets of Triple Hook Mooring Units and 2 sets of Double Hook Mooring Units, each with a...
Quick Release Mooring Hooks for Singapore
A returning customer and major tank storage provider in Singapore ordered these two sets of Double Hook Mooring Units with Integral Capstans and a safe working load each of 60 tons. The units were specifically designed to replace the former ones, installed there by a different manufacturer. The Mooring Hooks...
Replacing old capstans in Sweden
The Port Authority of a vast Swedish harbor contacted us to replace some old capstans at their oil jetty. It didn’t take us long to produce fresh new capstans, making the jetty ready for the future. The capstans are freestanding and ready to be placed within a hazardous area. Interested in our capstan solutions? Please view directly https://www.mampaey.com/capstans/
Mampaey equips new sea jetty in Rotterdam
One of our customers is building a new sea jetty in the port of Rotterdam, intended for the transshipment of vegetable oils and biofuel related products. Mampaey supplied two Quadruple Hook Mooring Units and two Double Hook Mooring Units for this project, each with a safe working load of 60...
Successful inspection and calibration
One of our Commissioning Engineers finished the annual recalibration on the HÖEGH GALLEON in Curacao. This vessel was previously used as a LNG carrier but has been converted into a FSRU. Soon the HÖEGH GALLEON will be in Australia for a while. In order to use the hooks in the...
Revamping with iMoor
Mampaey is proud to announce that we supplied an upgrade for a complete iMoor system for a major national oil refinery in Izmir (Turkey). Our system will significantly improve the operations of the infrastructure. One of the major benefits is the full control over the safety aspects of a moored...
Replacing 12 Quick Release Mooring Hooks
After 27 years of service, our well valued customer from Turkey returns to Mampaey to increase their finger pier vessel capacity. Therefore, the existing Mampaey hooks will be replaced by: 12 sets Double Quick Release Mooring Hooks with 150 Tons SWL including Capstan and 6 sets Double Mooring Hook Unit...